Construction

Designing concrete floors with STORAX rails for mobile racking

We have designed a number of reinforced concrete floor slabs to support Storax loads with the rails cast in. There are a number of considerations when doing the design the main one being the moving point loads from the wheeled racks. – We use finite element analysis with plate elements and a spring support at each node to model    the subsoil stiffness and insulation underlay stiffness. – The rail stiffness is included in the model to reduce the maximum slab moments and hence  reduce the amount of rebar without effecting the factor of safety. – The sequence of construction is critical to a good installation which is as follows: – Note this is for a cold room slab and would be similar for a standard warehouse excluding the  insulating layers. – Level, compact and test the subsoil – Excavate strips under the rail positions – Cast the reinforced strips on an insulation layer with rebar protruding along the edges – Fix the rails to the strips by drilled anchors. – Adjust the rail alignment to the very fine tolerances using the adjustable rail clamps – Check that all the rail clamp bolts are tight – Recheck the alignment with a laser. – Place the under slab insulating layer – Fix the remaining rebar – Employ an expert flooring contractor to cast and power float the slab to tight tolerances – The strips are bonded into the final cast with the protruding rebar and the final slab acts as a  single monolithic unit taking advantage of the thicker slab under the rail point loads. The following list of items can easily trip up the designer: – Expansive clays in the subsoil-if there is any doubt in an experienced designer’s mind then a  Geotechnical report must be called for. – Concrete shrinkage-these slabs are generally large and have no expansion joints-they shrink  towards the centre point of the slab and if there is any restraint a crack will occur at the restraint-  i.e. all existing steel columns (and any other restraint) must be wrapped with compressible layer  e.g. jointex. These slabs are often cast on top of existing slabs which then require access ramps-  care must be taken to ensure the ramp is not anchored and can shrink with the slab. – There are surround reinforced concrete kerbs and the starter bars for these kerbs must be cast  into the slab. In cold rooms the moisture content of the concrete must be below specified levels before the temperature is drawn down-excess mixture will expand on freezing and cause problems. Extensions to existing freezer slabs have the problem that the new concrete touches frozen concrete and will not set-propriety products must be used in locally around the frozen areas or an igloo must be built locally to allow the temperature of the existing slab to be raised locally when casting. Rod Holmes CONSPEC cc CONSULTING CIVIL ENGINEERS 7 SURCINGLE AVE, HOUTBAY 7806 TEL/FAX: 021 790 5638

Designing concrete floors with STORAX rails for mobile racking Read More »

DID YOU KNOW – Storax can withstand earthquakes !

In February 2010 an earthquake measuring 8.8 on the Richter scale hit Fruiticola Olmué, a fruit processing company in Chile, South America. Fruiticola had a Storax system installed holding over 2 300 pallets and remained unaffected. Following the tragic events, Fruiticola’s owner Max Hassler wrote to the then Managing Director of Storax – Ken Jones. He said: “I write to you in acknowledgement of the quality of the system installed in our plant in Chillan.  We had only very minor damage, a small purchase order is being made, and the system remained operational once we could get to it after the events here in Chile.  We are located less than one hundred kilometres from the epicentre of this very large quake.” Two years after the quake Fruiticola Olmué installed their 2nd Storax mobile system with a hold capacity of 7,850 pallets.  Storax mobiles installed in seismic areas have additional features which increase base stability. For the full story visit: http://warehousenews.co.uk/2012/03/storax-racking-systems-unshakeable/  

DID YOU KNOW – Storax can withstand earthquakes ! Read More »

Should water tanks be a compulsory feature at all cold stores and warehouses? – Lutz Refrigeration responds

Rain water storage systems to supply evaporative cooling towers here in South Africa We are proud to say that Lutz Refrigeration in collaboration with Barpro will be pioneering the use of rain water harvesting to supply the fridge plant at Southern Cold Storage’s new freezer rental storage facilities in Germiston Johannesburg. The multiplex system will be cooling the 20 000m³ freezer room down to -25°C.  Opting for evaporative cooling with Freon is very much against the grain, but by doing this we managed to keep the capital costs in a standard Freon league while competing neck and neck with Ammonia plants on energy efficiency. Initially we will be installing 20m³ of water storage facilities which will offer two days of standby water capacity and will require a 20mm rainfall to be topped up.  Judging from historical rain falls and a bit of field testing we will probably increase that to around 40m³ once the system is up and running. The freezer store rooms are scheduled for commissioning during November this year, we will follow up with photos and feedback once the system is up and running. For more information contact Kevin Walter by email: kevinw@lutzrefrigeration.co.za

Should water tanks be a compulsory feature at all cold stores and warehouses? – Lutz Refrigeration responds Read More »